Nissan Patrol and Ford Maverik + Cars of the Nissan Patrol and Ford Maverick series + Diagnostics of malfunctions + Settings and routine maintenance + Engine + Systems of cooling, heating and air conditioning + the Power supply system and production of the fulfilled gases + Systems of decrease in toxicity of the fulfilled gases + Systems of electric equipment of the engine - Transmission + Manual box of gear shifting (RKPP) + Automatic transmission - Transfer case Removal and installation Dismantling Check of a condition of internal components Assembly + Driveshafts + Coupling + Brake system + Forward and back bridges, running gear and steering + Body + Onboard electric equipment
|
Removal and installation
|
The following special tools will be necessary for performance described below procedures: a replaceable face head on 30 mm (for removal of a forward driving flange); a head on 32 mm (for removal of a back driving flange); a tsiferblatny measuring instrument, a stripper set, a press with basic plates and a TORX T45 type head (for box dismantling); a press with basic plates and head Т45 (for box assembly). |
Removal
|
Tire out the car back wheels on a platform, strongly cock the parking brake and block back wheels wedges.
To Poddomkratta a car front also establish it on props.
Turn out a stopper and merge oil from a transfer case. Grease a carving of a drain stopper with hermetic, screw and strongly tighten a stopper.
Mark position of forward and back driveshafts from each other, and also situation them concerning a flange of a leading gear wheel of the main transfer, a flange of a transfer case and a drum lay a brake.
Give bolts and nuts and remove driveshafts from the car.
If the transfer case is subject to dismantling or the epiploon пепереведите the lever of switching of modes of a box in situation 4Н demands replacement and by means of a head on 30 mm give a nut of fastening of a forward driving flange.
In case of need remove a forward driving flange by means of a stripper. Take an epiploon from a transfer case (use a stripper or a hammer with sliding brisk).
By means of a head on 32 mm give a fastening nut to a box of a back driving flange, mark the provision of a flange in relation to a drum of the parking brake.
Release the parking brake, remove a drum of its mechanism, then by means of a stripper remove a back driving flange.
Give bolts of fastening of a back board of the mechanism of the parking brake and remove brake assembly from a transfer case. In order to avoid a pulling of a driving cable fix assembly aside.
In case of need take an epiploon of a back driving flange from a case of a transfer case (use a stripper or a hammer with sliding brisk).
Unbend back a rubber protective cover, unscrew a nut of fastening of a rod of switching to a control lever of a transfer case, remove a washer and the remote plug. Disconnect a switching rod from a control lever.
Disconnect a ventilating hose, disunite electric sockets and liberate electroconducting from fixing collars on a transfer case.
Get a jack under transmission, prop up them the last, having accepted its weight together with weight of a transfer case.
Give bolts of fastening of a cross-section beam of a support of transmission to a frame of the chassis of the car and carefully lower a jack so that there was a possibility of a reversing of the top bolts of fastening of a transfer case to transmission.
Give all fixing screws except for the bottom.
Lift the jack got under transmission and screw bolts of fastening of a cross-section beam.
Get a telezhechny jack under a transfer case and fix on it the last a chain or a sling.
Give the remained fixing bolts and take a transfer case from under the car (appearance of the assembly of a transfer case removed from the car is shown on an accompanying illustration).
|
|
|
The weight of a transfer case makes about 50 kg and consequently attempts of its removal without application of a telezhechny jack are fraught with receiving traumas and damage of components. |
Installation Installation is made upside-down.
|
In case of need grease sponges of epiploons of driving flanges with universal greasing on a lithium basis and establish epiploons in a transfer case.
Tighten with demanded effort fixing bolts of a transfer case.
Tighten with demanded effort bolts of a back guard of the mechanism of the parking brake. Cock the parking brake and tighten with demanded effort of a nut of fastening of flanges.
Establish driveshafts (according to the labels made in the course of dismantle).
Fill in in a transfer case necessary amount of oil of a demanded grade (see size tables and adjustments at the end of the Management).
Carry out trial runs of the car, checking serviceability of functioning of a transfer case. Check oil level in a box, in case of need make addition.
|
|
|
|